Solution
Option D is correct answer.
It is derived as:
\(\rm Power (P)\) = $\frac{Work done}{time taken}$
\(\rm Power (P)\) = $\frac{[ML^{2}T^{-2}]}{[T]}$
\(\rm Power (P)\) = \(\rm [ML^{2}T^{-3}]\)
Other options are not correct.
0